Fire Inspection Request and Inquiry        

 


Enter MDC Permit, Fire Application, or Fire Municipal Number:

  Print Permit Card
You need your Process Number to print permit card.
space
Important Information

Fire Inspection Request:
  • Inspections must be scheduled the day prior to the inspection before 4:00 p.m.
  • Inspections may be cancelled if re-inspection fees are due from prior inspections.
  • Cancellations must be submitted by 4:00 p.m. of the same day of inspection request.  All cancellations after 4:00 p.m. will result in a cancellation fee.

  • See More ...
  • If the inspector has to verify for additional categories on your permit which may not be required or not pulled (i.e. 0032, 0004, 0043); schedule inspection as a Category Verification.  Please make a note in the provided comment box which category needs verification for removal.
  • Inspections that are scheduled the day before a County Observed Holliday, the inspection will roll over to the next business day
SRI Inspection Request:
  • Weekday SRI inspection must be requested before 1:00 p.m.
  • Weekend SRI inspection must be requested by Friday before 1:00 p.m.
  • Inspections that are scheduled the day before a County Observed Holiday, the inspection will roll over to the next business day.
Simplified Permitting Process:
  • Inspections must be requested online before 4:00 p.m.
  • Inspections will be scheduled within 3 business days of the online request per F.S. 553.7932(4).
  • Cancellations must be submitted by 4:00 p.m. of the same day of the inspection request. All cancellations after 4:00 p.m. will result in a cancellation fee.

  • See More ...
  • For fire alarm inspection requests, an approved electrical rough inspection is required prior to scheduling a fire inspection.
  • Project plans and specifications are to be made available to the inspector at each inspection, and when applicable to the installation or replacement of an equivalent fire sprinkler system component, the manufacturer’s installation and pertinent testing instructions needed to certify or accept the component are also to be made available per F.S. 553.7932(5).
  • If the fire inspector determines additional documents are required for recording purposes, the contractor must provide such documentation—along with the project plans and specifications—in electronic form within 4 business days after the inspection per F.S. 553.7932(5).

For questions or inquires, please call the Fire Prevention Division at (786) 315-2770.