This Is Not An Official Document
12/4/2024 3:36 AM - Version i2.20

Calculations are based on the criteria stipulated in Section 24-42.3, Miami-Dade Code, and Federal Consent Decree (Case: No. 1:12-cv-24400-FAM)

Please be aware that the information obtained with this Application is for general information only, and it is only correct as of the time and date in which the search was executed. Consequently, the information obtained with this application DOES NOT CONSTITUTE AN OFFICIAL DEPARTMENTAL DETERMINATION or APPROVAL for your project. For any additional information about the Pump Station Capacity Estimator application, please refer to the Application Guidelines or contact the RER–DERM Wastewater Permitting Section at 305-372-6600 or via email at [email protected]

* Required fields

Search Criteria
Sanitary Sewer Utility *
Pump Station Number *
Proposed Projected Flow (GPD) * GPD (Only numbers are allowed)
Project will require, or is part of, a Sewer Extension *
   



Pump Station Capacity Estimator Result

Search Criteria Detailed Result
Sanitary Sewer Utility
Pump Station Number
Proposed Projected Flow (GPD) GPD
Project will require, or is part of, a Sewer Extension


Treatment Plant Codes
CD
ND
SD
TP
AV
Central District Treatment Plant
North District Treatment Plant
South District Treatment Plant
Homestead Treatment Plant
Americana Village

Pump Station Acronyms
GDP
HAMA
NAPOT
MART
Gallons Per Day
High Annual Monthly Average
Nominal Avg. Pump Operating Time
Monthly Average Run Time
Moratorium Codes  


    For Additional Moratorium Code Details Select this Link